Farmacapsulas - Litoplast Gas Generator
Description Project
Strategic ally E2 Energía Eficiente
- Electrical Installations, Communications and Electronic Security of the Gas Generation Center.
- Medium and low voltage networks, 2800 KVA Electrical Substation.
- Supply and installation of lighting outlets with luminaires.
- Low Voltage Cells, Grounding and Shielding system.
- Communications System
- Instrumentation and Control Network System
- Fire Detection System.
Share this project