GLOBENET DATACENTRE ICREA4
Description Project
- Electrical Infrastructure 1200 KVA in medium and low voltage with backup redundancy with power plants, battery banks, UPS.
- Communications Infrastructure (Multimode Fiber Optic Star Topology for 48 Data Cabinets Services)
- Electronic Security Infrastructure (CCTV, Access Control, Fire Detection) in White and Outdoor areas.
Share this project