Barranquilla Airport - Gas Generator
Description Project
Strategic ally E2 Energía Eficiente
- Electrical and communications installations
- Medium and low voltage networks and synchronization with the public energy grid.
- Supply and installation of lighting outlets with luminaires.
- Supply and installation of Detection and Extinguishing Systems in control room installations and Generator areas, including the gas station.
- 2.3 km Fiber Optic System for communications between the three substations and the generation center.
Share this project